Good Hope Hospital, Birmingham
Good Hope Hospital Mechanical and Electrical Engineering Works
M&E Engineering Works at Good Hope Hospital in Birmingham

Client: University Hospital Birmingham, NHS Trust

Main Contractor: McAvoy

M&E Consultant: Dynamic Design

Start date: March 2025

Completion date: September 2025

MEIS were appointed by our valued client, McAvoy, to deliver the MEP installations in this new Medical Assessment Unit (MAU) extension at Good Hope Hospital for University Hospital Birmingham, NHS Foundation Trust. 

This project consisted of new consulting rooms, clean rooms, a waiting area, and essential support facilities. The programme was delivered in a live hospital environment and in line with strict Health Technical Memoranda (HTM) system compliance. 

The project was successfully handed over to the Client in September 2025.

 

Systems delivered by MEIS:

Mechanical:

  • Air conditioning installations 
  • Ventilation and ductwork installations 
  • Central heat recovery air handling unit (AHU) system
  • Direct expansion (DX) and low temperature hot water (LTHW) systems
  • Building management systems (BMS)
  • Boosted mains cold water
  • Domestic hot water systems
  • Low temperature hot   water (LTHW) flushing and domestic chlorination

 

Electrical:

  • Main switchgear installations
  • Bespoke lighting, emergency lighting and dimming controls systems
  • External lighting
  • General power installations
  • Security installations, including CCTV, intruder and door access
  • Fire alarm installations
  • Nurse call and panic alarms
  • Television and audio-visual systems
  • Testing and commissioning
 
We are delighted with how the new facilities have turned out!

For M&E consultancy and services enquiries, please contact us or call the office on +44 (0) 28 9099 0331