Leeds City College – Park Lane Campus
Mechanical Electrical and Plumbing Installations at Park Lane Campus of Leeds City College

Client: Luminate Education Group

Main Contractor: McAvoy

M&E Consultant: Dynamic Design  

Start date: January 2024 

Completion date: June 2025

Leeds City College is one of the largest education institutions in the UK. With over 20,000 students, it is one of the biggest providers of apprenticeships regionally. Park Lane Campus is home to the Sport and Sixth Form Science departments. 

MEIS were appointed by our client, McAvoy, to deliver the Mechanical, Electrical and Plumbing (MEP) installations in this new three storey science block – containing sports science laboratories, a massage room, IT rooms, teaching rooms and ancillary spaces.

We worked closely with the main contractor and other specialists to ensure the programme was delivered on schedule, being handed over to the client in June 2025.

Systems delivered by MEIS:

Mechanical:

  • AC installations 
  • Ventilation, heat recovery and ductwork installations 
  • Building Management System (BMS) 
  • Boosted Mains Cold Water 
  • Domestic Hot Water Air Source Heat Pump (ASHP) Systems 
  • Laboratory Gas Systems 
  • Low Temperature Hot Water (LTHW) Flushing
  • Chlorination 
  •  

Electrical:

  • Main switchgear installations 
  • Bespoke lighting, emergency lighting and dimming controls systems 
  • External lighting 
  • General power installations 
  • Data and IT infrastructure 
  • Fire alarm installations 
  • Video door entry and access control installations  
  • CCTV Installations 
  • Intruder alarm systems 
  • Lightning protection installations 
  • Photo Voltaic installations 
  • EV Charging installations 
  • Testing and Commissioning 
 

 